Customization: | Available |
---|---|
After-sales Service: | Provide |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Multifunctional Industrial Hydraulic Steel Scrap Grapple For 6-8 Ton Excavator
HOMIE hydraulic grapple is widely used for handling, loading, and unloading materials, such as sugarcane, wood, stone, steel slag, grabbing garbage, scrap metal and other special operations.
Single cylinder grapples are all of the new design, allowing wide jaw opening width and very tight closing.
Model | Max.Opening | Height/ Opening Height |
Width/Close Width | Weight | Working Pressure | Working Flow | Clow Length | Excavator |
unit | mm | mm | mm | kg | bar | Lpm | mm | ton |
HM01-B1 | 804 | 781/627 | 150/146 | 75 | 120-150 | 20-30 | 407 | 1-3 |
HM03-B | 1284 | 1258/1014 | 391/215 | 243 | 160-180 | 20-30 | 730 | 3-5 |
HM04-B | 1671 | 1431/1113 | 470/299 | 417 | 160-180 | 20-30 | 905 | 6-8 |
HM06-B | 1900 | 1717/1385 | 560/397 | 710 | 180-200 | 30-45 | 1075 | 12-15 |
HM08-B | 2263 | 1970/1575 | 695/478 | 1120 | 200-220 | 50-70 | 1260 | 18-24 |
Logs, wood, stones, steel and iron scraps demolition, scrap handing, cleaning, moving, loading, sorting and organizing materials in order.
HOMIE hydraulic stone grapple, rock grapple produced by the factory, price concessions, direct shipment from the manufacturer, minimum order of one piece, can be sent worldwide.
Hydraulic Steel grapple, rock grapple, log grapple are packed in wooden cases. We can also packing according to customers' request.
1.What color can you produce ?
Yellow.If you need special, please advise.
2.How about the delivery time ?
Within 3-7 working days after receiving advance payment.