Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
HOMIE stone grapple rock grab is a kind of excavator attachments that is mainly used for stone, rock, wood, log, timber, and other large scraps handing, moving, loading and organizing.
Please check the following rock grapple specifications to choose the right grab model:
Category | Unit | HM04 | HM06 | HM08 | HM10 |
Weight | Kg | 430 | 890 | 1630 | 1680 |
Opening | mm | 1371 | 1539 | 2492 | 2492 |
Oil pressure | Kg/cm2 | 120-160 | 150-170 | 160-180 | 160-180 |
Setup Pressure | Kg/cm2 | 180 | 190 | 200 | 210 |
Oil Flow | L/Min | 50-100 | 90-110 | 100-140 | 130-170 |
Suitable Excavator | Ton | 4-8 | 9-16 | 17-25 | 26-35 |
1, Material: Q355B Mn plate.
2, Original EATON brand motor, Taiwan Winner valve core, quick-plug integrated wiring harness.
3, Unlimited clockwise and anti-clockwise 360° rotary swing bearing system 3+2, 4+3, 5+4 fingers for your option.
4, Pin and bush heat-treated, increase strength and wear-resistance.
5, Brake valve make it safer from inertia or accident.
6, Welders with ten years of experience, the welding process removes the hard force, and there will be no welding cracks for our hydraulic steel grapple.
Logs, wood, stones, steel and iron scraps demolition, scrap handing, cleaning, moving, loading, sorting and organizing materials in order.
HOMIE hydraulic stone grapple, rock grapple produced by the factory, price concessions, direct shipment from the manufacturer, minimum order of one piece, can be sent worldwide.Plastic cloth, tensile membranes, packing tape and wooden box contribute a wonderful packing procedure. With Plastic and tensile membranes, can prevent goods rusting when sailing on the sea for long time.
1.What color can you produce ?
Yellow.If you need special, please advise.
2.How about the delivery time ?
Within 3-7 working days after receiving advance payment.