Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction

Product Details
Customization: Available
After-sales Service: Provide
Warranty: 18 Months
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
39
Year of Establishment
2018-10-25
  • Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
  • Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
  • Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
  • Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
  • Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
  • Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Find Similar Products

Basic Info.

Model NO.
HM04
Type
Excavator Attachment
Application
Excavator
Certification
CE, ISO9001: 2000, SGS
Condition
New
Designs
Double-Cylinder&Single-Cylinder
Weight
590kg
Function
Railway Construction and Maintenance
Product Name
Railway Sleeper Grapple,Sleeper Changer
Model
Hm04
Suitable Excavator
5-8ton
Transport Package
Export Standard Packing Method
Specification
For 5-8 Ton
Trademark
HOMIE
Origin
Yantai, China
HS Code
8431499000
Production Capacity
100PCS/Year

Packaging & Delivery

Package Size
150.00cm * 99.00cm * 76.00cm
Package Gross Weight
650.000kg

Product Description

 Product Description:

Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction

Railway sleeper grapple&ballast removal plate

HOMIE Railway Sleeper Changer is an excavator attachment designed for replacing sleepers and long bearers,for railway track construction and mentainance project, HOMIE awarded sleeper machine patent in 2020.We have successfully provided our machines to Chinese railway govement projects, and other countires.
We have 2 different railway sleeper changing grapples for your choice:
 
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction

                   A.single-cylinder sleeper grapple                                            B.double-cylinder sleeper grapple
Details:
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction

How to use a sleeper changer equipment?
1.Clean up the ballast under the sleepers so as to stack the ballast that has been pulled out.
2.Adjust the boom and arm, and place the ballast pull out device horizontally on the side of the sleeper.
3.Ensure that the upper end of the chain is lower than the bottom of the sleeper.
4.Start the ballast removal motor (select high or low speed according to ballast slagging degree).
5.Press the rotary cylinder button to rotate the ballast removal mechanism towards the inside of the sleeper. Pay attention to the speed of rotation.If it is stuck, the slewing mechanism can be rotated in the reverse direction, and then continue to rotate in the forward direction.
6.When there are too many ballast on the reverse side, the rotating ballast removal mechanism can be turned outward, and the ballast can be discharged to the outside of the sleeper.
7.When the skimming mechanism swings to the level of the sleeper, stops rotating. At this time, Operate the machine to move backwards.
8.After 5-10 meters on one side, put the ballast bag under the suspended sleepers and return to the starting point to start the other side working.
9.When the ballast removing mechanism changes direction, raise the boom and the arm, and press the reverse button when the slag removing mechanism is turned to the apex to complete the direction conversion.
Product real shots:
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Sucessful projects:
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway ConstructionExcavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway ConstructionTechnical specifications:
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Grapple with Plate Weight
kg
746
Max Jaw Opening Size
mm
400
Oil Pressure
Kg/cm2
120-160
Set-up Pressure
Kg/cm2
180
Operating Flux
L/Min
50-100
Cylinder Power
Ton
4.5*2
Suitable Excavator
Ton
5-8
Patent Design Certificate&CE Certificate
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
About us:
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Our company is Yantai Hemei Hydraulic Machinery Equipment Co., Ltd. was established in 2009,specializing in the production and development of various excavator attachments. There are more than 100 employees, an area of 5,000 square meters, and an annual production capacity of 5,000 pcs. Our products are exported to global countries,with annual sales of US$15 million.
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
We mainly serve five major areas: mining, forestry logging, scrap metal recycling, building demolition and engineering construction projects. Our products have obtained CE,ISO9001 certifications and more than 20 patent certificates. We have a professional team of 6 engineering designers, an experienced after-sales team and workers with professional certificates for more than 10 years to provide you with better services.
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
Excavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway ConstructionExcavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway ConstructionExcavator Sleeper Changing Machine Hydraulic Sleeper Grapple for Railway Construction
 





    
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now